São Salvador Hydroelectric Power Plant
São Salvador HPP is located on the Tocantins River in the municipality of Paranã (TO). With a run-of-river reservoir of 104 km², the plant went into operation in 2009. Its concession agreement expires in 2037.
The plant has an installed capacity of 243.2 MW, operates two generator units with vertical turbines of the Kaplan type and a 121.6 MW output from each. It has a physical guarantee of 148.2 average MW for commercialization.
São Salvador HPP is certified according to ISO 9001 and 14001 quality management and environmental standards and the OHSAS 18001 occupational health and safety standard.
In 2011, the Company began operating the plant remotely from the control room at Salto Santiago HPP and in 2017, this control was transferred to the Generation Operations Center (COG), located at ENGIE’s head office in Florianópolis (SC).
Now generating
Last updated: : 20:10
*ENGIE installed capacity: -- MW
Reservoir Volume
Last updated: : 20:10
Net Generation
You are viewing
MONTH | MONTHLY PRODUCTION (GWH) | TOTAL ANUAL |
---|
Loading...
MONTH | MONTHLY PRODUCTION (GWH) | TOTAL ANUAL |
---|
Location
Rodovia TO 387 PRN, km 40
À esquerda +/- 20 km, São Salvador
CEP 77360-000
Paranã / TO
(62) 3379-8600
CNPJ 02.474.103/0018-67
IE 29.412.567-1