Trairi Wind Complex
The two-stage Trairi Wind Complex, located on the Ceará state coast, was entirely developed by ENGIE (green field project).
The first stage, which began in 2011, included implementation of the Fleixeiras I (30.0 MW), Guajirú (30.0 MW), Mundaú (30.0 MW) and Trairi (25.4 MW) wind farms. These were completed in 2014 and granted commercial operation authorization valid to 2041.
The second stage involved implementation of the Cacimbas (18.9 MW), Estrela (29.7 MW), Ouro Verde (29.7 MW) and Santa Mônica (18.9 MW) wind farms, which commenced commercial operations in 2017 and are authorized to operate until 2045.
The Trairi Wind Complex has 86 wind turbines for a total 212.6 MW in installed capacity and 102.3 aMW physical guarantee for commercialization.
In 2018, remote operation of the Trairi Wind Complex began at the Generation Operations Center (COG), located in ENGIE’s registered offices in Florianópolis (state of Santa Catarina).
[
{
"complexo": "Umburanas Wind Complex",
"usinas":[
{"codigo":"EU01", "nome":"Umburanas 1"},
{"codigo":"EU02", "nome":"Umburanas 2"},
{"codigo":"EU03", "nome":"Umburanas 3"},
{"codigo":"EU04", "nome":"Umburanas 4"},
{"codigo":"EU05", "nome":"Umburanas 5"},
{"codigo":"EU06", "nome":"Umburanas 6"},
{"codigo":"EU07", "nome":"Umburanas 7"},
{"codigo":"EU08", "nome":"Umburanas 8"},
{"codigo":"EU09", "nome":"Umburanas 9"},
{"codigo":"EU10", "nome":"Umburanas 10"},
{"codigo":"EU11", "nome":"Umburanas 11"},
{"codigo":"EU12", "nome":"Umburanas 12"},
{"codigo":"EU13", "nome":"Umburanas 13"},
{"codigo":"EU14", "nome":"Umburanas 14"},
{"codigo":"EU15", "nome":"Umburanas 15"},
{"codigo":"EU16", "nome":"Umburanas 16"},
{"codigo":"EU17", "nome":"Umburanas 17"},
{"codigo":"EU18", "nome":"Umburanas 18"},
{"codigo":"EU19", "nome":"Umburanas 19"},
{"codigo":"EU20", "nome":"Umburanas 10"},
{"codigo":"EU021", "nome":"Umburanas 21"},
{"codigo":"EU022", "nome":"Umburanas 22"},
{"codigo":"EU023", "nome":"Umburanas 23"},
{"codigo":"EU024", "nome":"Umburanas 24"},
{"codigo":"EU025", "nome":"Umburanas 25"}
]
},
{
"complexo": "Conjunto Fotovoltaico Paracatu",
"usinas":[
{"codigo":"UFU1", "nome":"Usina Fotovoltaica Paracatu 1"},
{"codigo":"UFU2", "nome":"Usina Fotovoltaica Paracatu 2"},
{"codigo":"UFU3", "nome":"Usina Fotovoltaica Paracatu 3"}
]
},
{
"complexo": "Conjunto Eólico Campo Largo II",
"usinas":[
{"codigo":"EC08", "nome":"Campo Largo VIII"},
{"codigo":"EC09", "nome":"Campo Largo IX"},
{"codigo":"EC10", "nome":"Campo Largo X"},
{"codigo":"EC11", "nome":"Campo Largo XI"},
{"codigo":"EC12", "nome":"Campo Largo XII"},
{"codigo":"EC13", "nome":"Campo Largo XIII"},
{"codigo":"EC14", "nome":"Campo Largo XIV"},
{"codigo":"EC17", "nome":"Campo Largo XVII"},
{"codigo":"EC19", "nome":"Campo Largo XIX"},
{"codigo":"EC20", "nome":"Campo Largo XX"},
{"codigo":"EC22", "nome":"Campo Largo XXII"}
]
},
{
"complexo": "Campo Largo Wind Complex",
"usinas":[
{"codigo":"EC01", "nome":"Parque Eólico Campo Largo I"},
{"codigo":"EC02", "nome":"Parque Eólico Campo Largo II"},
{"codigo":"EC03", "nome":"Parque Eólico Campo Largo III"},
{"codigo":"EC04", "nome":"Parque Eólico Campo Largo IV"},
{"codigo":"EC05", "nome":"Parque Eólico Campo Largo V"},
{"codigo":"EC06", "nome":"Parque Eólico Campo Largo VI"},
{"codigo":"EC07", "nome":"Parque Eólico Campo Largo VII"},
{"codigo":"EC15", "nome":"Parque Eólico Campo Largo XV"},
{"codigo":"EC16", "nome":"Parque Eólico Campo Largo XVI"},
{"codigo":"EC18", "nome":"Parque Eólico Campo Largo XVIII"},
{"codigo":"EC21", "nome":"Parque Eólico Campo Largo XXI"}
]
},
{
"complexo": "Trairi Wind Complex",
"usinas":[
{"codigo":"ECAA", "nome":"Parque Eólico Cacimbas"},
{"codigo":"EEST", "nome":"Parque Eólico Estrela"},
{"codigo":"EOVE", "nome":"Parque Eólico Ouro Verde"},
{"codigo":"ESMA", "nome":"Parque Eólico Santa Mônica"},
{"codigo":"UEFL", "nome":"Parque Eólico Fleixeiras I"},
{"codigo":"UEMU", "nome":"Parque Eólico Mundaú"},
{"codigo":"UEGU", "nome":"Parque Eólico Guajirú"},
{"codigo":"UETR", "nome":"Parque Eólico Trairi"}
]
},
{
"complexo": "Conjunto Fotovoltaico Paracatu",
"usinas":[
{"codigo":"EFU1", "nome":"Usina Fotovoltaica Paracatu 1"},
{"codigo":"EFU2", "nome":"Usina Fotovoltaica Paracatu 2"},
{"codigo":"EFU3", "nome":"Usina Fotovoltaica Paracatu 3"},
{"codigo":"EFU4", "nome":"Usina Fotovoltaica Paracatu 4"}
]
},
{
"complexo": "Conjunto Fotovoltaico Floresta",
"usinas":[
{"codigo":"UFF1", "nome":"Usina Fotovoltaica Floresta 1"},
{"codigo":"UFF2", "nome":"Usina Fotovoltaica Floresta 2"},
{"codigo":"UFF3", "nome":"Usina Fotovoltaica Floresta 3"}
]
},
{
"complexo": "Conjunto Eólico Tubarão P&D 2",
"usinas":[
{"codigo":"ETB2", "nome":"Usina Eólica Tubarão P&D 2"}
]
}
]
Trairi Wind Complex
Umburanas 1
Last updated: :
20:10
*ENGIE installed capacity: -- MW
[
{
"complexo": "Umburanas Wind Complex",
"usinas":[
{"codigo":"EU01", "nome":"Umburanas 1"},
{"codigo":"EU02", "nome":"Umburanas 2"},
{"codigo":"EU03", "nome":"Umburanas 3"},
{"codigo":"EU04", "nome":"Umburanas 4"},
{"codigo":"EU05", "nome":"Umburanas 5"},
{"codigo":"EU06", "nome":"Umburanas 6"},
{"codigo":"EU07", "nome":"Umburanas 7"},
{"codigo":"EU08", "nome":"Umburanas 8"},
{"codigo":"EU09", "nome":"Umburanas 9"},
{"codigo":"EU10", "nome":"Umburanas 10"},
{"codigo":"EU11", "nome":"Umburanas 11"},
{"codigo":"EU12", "nome":"Umburanas 12"},
{"codigo":"EU13", "nome":"Umburanas 13"},
{"codigo":"EU14", "nome":"Umburanas 14"},
{"codigo":"EU15", "nome":"Umburanas 15"},
{"codigo":"EU16", "nome":"Umburanas 16"},
{"codigo":"EU17", "nome":"Umburanas 17"},
{"codigo":"EU18", "nome":"Umburanas 18"},
{"codigo":"EU19", "nome":"Umburanas 19"},
{"codigo":"EU20", "nome":"Umburanas 10"},
{"codigo":"EU021", "nome":"Umburanas 21"},
{"codigo":"EU022", "nome":"Umburanas 22"},
{"codigo":"EU023", "nome":"Umburanas 23"},
{"codigo":"EU024", "nome":"Umburanas 24"},
{"codigo":"EU025", "nome":"Umburanas 25"}
]
},
{
"complexo": "Conjunto Fotovoltaico Paracatu",
"usinas":[
{"codigo":"UFU1", "nome":"Usina Fotovoltaica Paracatu 1"},
{"codigo":"UFU2", "nome":"Usina Fotovoltaica Paracatu 2"},
{"codigo":"UFU3", "nome":"Usina Fotovoltaica Paracatu 3"}
]
},
{
"complexo": "Conjunto Eólico Campo Largo II",
"usinas":[
{"codigo":"EC08", "nome":"Campo Largo VIII"},
{"codigo":"EC09", "nome":"Campo Largo IX"},
{"codigo":"EC10", "nome":"Campo Largo X"},
{"codigo":"EC11", "nome":"Campo Largo XI"},
{"codigo":"EC12", "nome":"Campo Largo XII"},
{"codigo":"EC13", "nome":"Campo Largo XIII"},
{"codigo":"EC14", "nome":"Campo Largo XIV"},
{"codigo":"EC17", "nome":"Campo Largo XVII"},
{"codigo":"EC19", "nome":"Campo Largo XIX"},
{"codigo":"EC20", "nome":"Campo Largo XX"},
{"codigo":"EC22", "nome":"Campo Largo XXII"}
]
},
{
"complexo": "Campo Largo Wind Complex",
"usinas":[
{"codigo":"EC01", "nome":"Parque Eólico Campo Largo I"},
{"codigo":"EC02", "nome":"Parque Eólico Campo Largo II"},
{"codigo":"EC03", "nome":"Parque Eólico Campo Largo III"},
{"codigo":"EC04", "nome":"Parque Eólico Campo Largo IV"},
{"codigo":"EC05", "nome":"Parque Eólico Campo Largo V"},
{"codigo":"EC06", "nome":"Parque Eólico Campo Largo VI"},
{"codigo":"EC07", "nome":"Parque Eólico Campo Largo VII"},
{"codigo":"EC15", "nome":"Parque Eólico Campo Largo XV"},
{"codigo":"EC16", "nome":"Parque Eólico Campo Largo XVI"},
{"codigo":"EC18", "nome":"Parque Eólico Campo Largo XVIII"},
{"codigo":"EC21", "nome":"Parque Eólico Campo Largo XXI"}
]
},
{
"complexo": "Trairi Wind Complex",
"usinas":[
{"codigo":"ECAA", "nome":"Parque Eólico Cacimbas"},
{"codigo":"EEST", "nome":"Parque Eólico Estrela"},
{"codigo":"EOVE", "nome":"Parque Eólico Ouro Verde"},
{"codigo":"ESMA", "nome":"Parque Eólico Santa Mônica"},
{"codigo":"UEFL", "nome":"Parque Eólico Fleixeiras I"},
{"codigo":"UEMU", "nome":"Parque Eólico Mundaú"},
{"codigo":"UEGU", "nome":"Parque Eólico Guajirú"},
{"codigo":"UETR", "nome":"Parque Eólico Trairi"}
]
},
{
"complexo": "Conjunto Fotovoltaico Paracatu",
"usinas":[
{"codigo":"EFU1", "nome":"Usina Fotovoltaica Paracatu 1"},
{"codigo":"EFU2", "nome":"Usina Fotovoltaica Paracatu 2"},
{"codigo":"EFU3", "nome":"Usina Fotovoltaica Paracatu 3"},
{"codigo":"EFU4", "nome":"Usina Fotovoltaica Paracatu 4"}
]
},
{
"complexo": "Conjunto Fotovoltaico Floresta",
"usinas":[
{"codigo":"UFF1", "nome":"Usina Fotovoltaica Floresta 1"},
{"codigo":"UFF2", "nome":"Usina Fotovoltaica Floresta 2"},
{"codigo":"UFF3", "nome":"Usina Fotovoltaica Floresta 3"}
]
},
{
"complexo": "Conjunto Eólico Tubarão P&D 2",
"usinas":[
{"codigo":"ETB2", "nome":"Usina Eólica Tubarão P&D 2"}
]
}
]
Trairi Wind Complex
Net Generation
MONTH |
MONTHLY PRODUCTION (GWH) |
TOTAL ANUAL |
MONTH |
MONTHLY PRODUCTION (GWH) |
TOTAL ANUAL |
janeiro |
5.9 |
|
5.9 |